Use case 08 · Municipal utilities and distribution network operators
The energy transition arrives as an application. Hundreds a day.
How a municipal utility handles grid connections, the smart meter rollout and customer service with Infiniaflow. With agents for pre-checks, appointments and monitoring, in its own data centre for critical infrastructure.

The industry
The story
March to May: a subsidy programme, a target, twelve technicians.
A municipal subsidy programme for heat pumps and storage systems starts. At the same time, the next rollout stage for smart metering systems must be completed. In the first week, three times as many applications arrive as usual.
Fictional example scenario
Where it gets stuck
Most applications were simple. They still sat in the same queue.
Around two thirds of the requests could have been approved immediately after a pre-check. Because all were treated the same, the simple ones also waited for the few specialists.
Figures from the fictional example scenario.
The approach
Simple cases in minutes, difficult ones with full attention.
Infiniaflow connects SAP IS-U, the network information system, workforce management, the portal and telephony. Agents pre-check applications, inform applicants and confirm installation appointments.
How it ends
What happens next is in the report.
On 37 pages we show how the case runs with Infiniaflow, step by step and with the tools in use. Plus the side-by-side result, the calculation and a plan for the first 90 days.
- Grid connection agent
- Meter exchange in the technician app
- Requests as a Kanban
- Trend Radar and Deep Research
- What agents do not do
- The result side by side
- Calculation and assumptions
- Ready in 90 days
- Sources



More use cases
From Energy, security and infrastructure
Nuclear technology · DecommissioningClearance in days instead of weeks. Without data leaving the plant.
Security and defence industryCollaboration without a third-party cloud. Even when it has to be quick.
Nuclear technology · New build and supplyEurope is building reactors again. Whoever supplies needs every document immediately.
Unsplash, https://images.unsplash.com/photo-1473341304170-971dccb5ac1e, Unsplash-Lizenz