Use case 18 · Medical device manufacturer
Tuesday, 08:10: 14 follow-up requests from the notified body. By Friday all are answered.
How a medical device manufacturer runs technical documentation, changes and audits with Infiniaflow. With agents that compile evidence and people who approve.

The industry
The story
Tuesday, 08:10. The notified body sends 14 follow-up requests.
For the recertification of a catheter system, 14 questions on the technical documentation come in. The deadline is 30 days. The head of Regulatory Affairs is on sick leave for three weeks.
Fictional example scenario
Where it gets stuck
Because the evidence was scattered, the deadline was barely enough.
The documents existed, but in five systems and several revisions. Without the head of Regulatory Affairs, nobody could say for certain which version applied.
Figures from the fictional example scenario.
The approach
The documentation is connected before the question arrives.
Infiniaflow connects the DMS, the QM system, the PLM, complaints and lab reports into a documentation graph. When a follow-up request arrives, an Agent Room opens with the mapping and draft answers.
How it ends
What happens next is in the report.
On 35 pages we show how the case runs with Infiniaflow, step by step and with the tools in use. Plus the side-by-side result, the calculation and a plan for the first 90 days.
- The documentation graph
- Follow-up question in the thread
- Safety report in Write and Sheets
- Trend Radar and Deep Research
- Data protection and co-determination
- The result side by side
- Calculation and assumptions
- Ready in 90 days
- Sources



More use cases
From Industry and production
Mechanical and plant engineeringKnowledge that grows with every machine.
Cable and wire industryThe bid goes out on time. Even when the expert is ill.
Automotive suppliersA plant closes. The knowledge of 31 years moves with it.
Unsplash, https://images.unsplash.com/photo-1579154204601-01588f351e67, Unsplash-Lizenz