Use case 03 · Nuclear technology · Decommissioning

Clearance in days instead of weeks. Without data leaving the plant.

How a nuclear power plant being decommissioned uses the knowledge from decades of operation for clearance, documentation and planning. With Infiniaflow in the plant's own network, without a connection to the outside.

Read the story
Plant components in an industrial hall

The industry

33nuclear power plants with power reactors are shut downSource: BASE
approx. EUR 1 bndecommissioning costs per plant unitSource: Bayerisches Umweltministerium
over EUR 24 bnoperators have paid into the disposal fundSource: Bayerisches Umweltministerium

The story

Batch 114: 38 tonnes of piping that is due to leave the plant.

The clearance measurement facility has taken its readings. Now the clearance application to the supervisory authority is needed. Only then may the material go to the scrap dealer. Until then it sits in the buffer store, and that is almost full.

Fictional example scenario

Where it gets stuck

Fifteen working days of turnaround. Most of that time someone was searching or waiting.

What fills the time is the search for a single document and waiting for people who are not available right now. And because the buffer store is full, dismantling stops as well.

15 daysfrom the measurement result to the complete file
approx. 80 hsearching the archive and document stores
Retirementthe colleague who knew the history

Figures from the fictional example scenario.

The approach

The plant's memory, retrievable for every container.

Infiniaflow runs in the isolated plant network, opens up the archive, measurement data, residual material tracking and SAP in InfiniaCore and gives each department specialised AI agents at its side.

No connection to the outsidePlatform and language models run on servers in the plant network.
Always with sourceEvery statement points to document, page and date.
Responsibility with peopleAgents prepare. People sign.

How it ends

What happens next is in the report.

On 22 pages we show how the case runs with Infiniaflow, step by step and with the tools in use. Plus the side-by-side result, the calculation and a plan for the first 90 days.

  • Clearance log
  • InfiniaHub in the real case
  • Clearance dossier
  • Telephone and mobile
  • Automating manual work
  • Roadmap
  • The result side by side
  • Calculation and assumptions
  • Ready in 90 days
  • Sources
PDF by email, instantly
INFINIAFLOW · USE CASE 03Nuclear technology · DecommissioningClearance in days instead of weeks. Without data leaving the plant.
Plant components in an industrial hall
22 pages · PDF
Kilian Treiber
Kilian TreiberCo-founder and CTOkt@infiniaflow.comTel: +49 911 148 707 67-0Mob: +49 172 84 56 977
Ralf Dorbath
Ralf DorbathCo-founder and Head of Salesrd@infiniaflow.comTel: +49 911 148 707 67-0Mob: +49 160 63 26 132