Use case 12 · Nuclear technology · New build and supply
Europe is building reactors again. Whoever supplies needs every document immediately.
How a German component supplier manages trade fair, tender, specification and qualification for the French new-build programme with Infiniaflow. With agents, team chat and company memory, entirely in house.

The industry
The story
A valve manufacturer wants into the programme. The route begins at a trade fair in Paris.
For the EPR2 programme, our example company wants to supply valves to a general contractor. Three days of talks at the trade fair, six weeks later the tender is decided.
Fictional example scenario
Where it gets stuck
Five breaks in one chain. Each small on its own.
Lost trade fair contacts, a language barrier without secure tools, a missed deadline, a clause read too late and an inspection report that only one person knew about.
Figures from the fictional example scenario.
The approach
One platform for the whole route from trade fair to order.
InfiniaCore is the memory, InfiniaHub the place where people and agents work together. Each phase of the six weeks gets its own tool.
How it ends
What happens next is in the report.
On 28 pages we show how the case runs with Infiniaflow, step by step and with the tools in use. Plus the side-by-side result, the calculation and a plan for the first 90 days.
- Organisational chart
- After the trade fair
- Agent Room
- Write and translation
- Workflows and Kanban
- Local only
- The result side by side
- Calculation and assumptions
- Ready in 90 days
- Sources



More use cases
From Energy, security and infrastructure
Nuclear technology · DecommissioningClearance in days instead of weeks. Without data leaving the plant.
Security and defence industryCollaboration without a third-party cloud. Even when it has to be quick.
Municipal utilities and distribution network operatorsThe energy transition arrives as an application. Hundreds a day.
Unsplash, https://images.unsplash.com/photo-1607472586893-edb57bdc0e39, Unsplash-Lizenz