Use case 16 · Construction company

Every change on site is documented. And paid for.

How a mid-sized construction company runs its site diary, plan changes, variations and subcontractors with Infiniaflow. With photos from the app, agents in the office and site managers who decide.

Read the story
Reinforcement work on a construction site

The industry

+1 %real turnover growth in the main construction industry in 2026Source: Bauindustrie
+11.3 %real order intake in June 2026 against the same month last yearSource: Bauindustrie
approx. 545,000people employed in the main construction industry, June 2026Source: Statistisches Bundesamt

The story

A residential quarter with 84 flats. A plan change that nobody saw in time.

In March, the client changes the cable routing on the second floor. The change arrives by email in the office. On site, the installer is still working from the old version.

Fictional example scenario

Where it gets stuck

The change was known. Just not where the building work was happening.

The evidence for the variation was missing afterwards, because the photos were on phones and the instruction was in an email. The company bore the removal and the delay itself.

2 daysuntil the change reached the site
40 %of the additional costs recognised
3 weeksdelay on the second floor

Figures from the fictional example scenario.

The approach

Site and office on the same version. Every change with evidence.

Infiniaflow connects the plan server, AVA, ERP, email and the site managers' mobile app. Agents distribute plan changes, assign photos, keep the site diary and prepare variations.

The valid version everywhereOld plans locked on the tablet.
Evidence with place and timeEvery photo is attached to a component and a plan.
A person signsVariations only after approval.

How it ends

What happens next is in the report.

On 35 pages we show how the case runs with Infiniaflow, step by step and with the tools in use. Plus the side-by-side result, the calculation and a plan for the first 90 days.

  • Site diary by voice
  • Phone line for subcontractors
  • Logistics and deliveries
  • Trend Radar and tenders
  • Data protection and co-determination
  • The result side by side
  • Calculation and assumptions
  • Ready in 90 days
  • Sources
PDF by email, instantly
INFINIAFLOW · USE CASE 16Construction companyEvery change on site is documented. And paid for.
Reinforcement work on a construction site
35 pages · PDF
Ralf Dorbath
Ralf DorbathCo-founder and Head of Salesrd@infiniaflow.comTel: +49 911 148 707 67-0Mob: +49 160 63 26 132
Kilian Treiber
Kilian TreiberCo-founder and CTOkt@infiniaflow.comTel: +49 911 148 707 67-0Mob: +49 172 84 56 977