Use case 06 · Automotive suppliers

A plant closes. The knowledge of 31 years moves with it.

How a supplier group with 18 plants handles relocation, knowledge transfer and new enquiries from manufacturers at the same time. With a group-wide wiki, Agent Rooms and a process map, entirely in its own data centre.

Read the story
Robots in body-in-white production

The industry

691,500employees in the automotive industry, mid-2026Source: Statistisches Bundesamt
−7.6 %at manufacturers of parts and accessories within twelve monthsSource: Statistisches Bundesamt
225,000jobs will be lost by 2035 according to the VDASource: VDA

The story

Eight weeks to the last shift. And an enquiry that cannot wait.

The German plant A closes, the G7 series moves to the Czech Republic. 140 experienced colleagues leave. At the same time, a manufacturer enquires about a housing for a new electric drive axle.

Fictional example scenario

Where it gets stuck

What was not written down is missing two weeks later.

The knowledge existed in the group, in experience, data from other plants and earlier quotations. It did not arrive where it was needed.

3 pageshandover after 34 years of experience
±12 %cost range in the quotation
2 weeksscrap at the new plant

Figures from the fictional example scenario.

The approach

A group memory across all plants. In every language.

Infiniaflow connects SAP tenants, MES, PLM and the repositories of all plants in InfiniaCore. Agents secure experience, transfer knowledge, process enquiries and write reports.

Group-wideOne memory for all plants, with permissions per site.
MultilingualWiki, chat and documents in six languages.
In its own data centreDesign and customer data stay in the group.

How it ends

What happens next is in the report.

On 37 pages we show how the case runs with Infiniaflow, step by step and with the tools in use. Plus the side-by-side result, the calculation and a plan for the first 90 days.

  • The path of a work instruction
  • Securing experience
  • A hub across plant boundaries
  • A component bridge on the map
  • Board report
  • Works council and data protection
  • The result side by side
  • Calculation and assumptions
  • Ready in 90 days
  • Sources
PDF by email, instantly
INFINIAFLOW · USE CASE 06Automotive suppliersA plant closes. The knowledge of 31 years moves with it.
Robots in body-in-white production
37 pages · PDF
Ralf Dorbath
Ralf DorbathCo-founder and Head of Salesrd@infiniaflow.comTel: +49 911 148 707 67-0Mob: +49 160 63 26 132
Kilian Treiber
Kilian TreiberCo-founder and CTOkt@infiniaflow.comTel: +49 911 148 707 67-0Mob: +49 172 84 56 977